RENOVA’s client was unaware of the previous use of his property as a service station and subsequently received a letter from the NJDEP which indicated that the USTs on the property needed to be properly closed. The client had a ground penetrating radar (GRP)...
Just prior to a real estate transaction of a commercial space in downtown Red Bank, the presence of a 1,000-gallon fuel-oil underground storage tank (UST) presented an obstacle that needed to be addressed. RENOVA was contracted for the removal of the UST, which...
At the tail end of a long-term project, RENOVA was selected as the contractor to bring the 1.8-acre former landfill site to completion in order to allow for a property transfer. RENOVA self-performed on the trenching and installation of a 2,200-linear foot passive gas...
When RENOVA mobilized to begin this project, the street was completely flooded from a recent Nor’easter that had blown through…not all that unusual for the Jersey Shore, but an additional challenge to be overcome, nonetheless. After a fire scorched the interior...
Recent Comments