Renova Environmental Company

Historic Landfill Capping

Market

Commercial

Location

New Jersey

Completion Year

2015

HISTORIC LANDFILL CAPPING AND PASSIVE GAS SYSTEM INSTALLATION

At the tail end of a long-term project, RENOVA was selected as the contractor to bring the 1.8-acre former landfill site to completion in order to allow for a property transfer. RENOVA self-performed on the trenching and installation of a 2,200-linear foot passive gas mitigation system, comprised of 6” HDPE piping joined with butt fusion, which RENOVA’s crew is certified to perform. Site civil work included segregating C&D debris scattered throughout the site for disposal, capping of the former landfill with imported, certified clean fill. Final grading was completed, and the site surface was restored with topsoil and hydroseeding. After site restoration was finished, RENOVA coordinated with the New Jersey Department of Environmental Protection (NJDEP) to obtain inspections and ultimate approval of the re-seeded land. The work was awarded with little notice, as the previous contractor did not perform as expected. RENOVA completed the project to the client’s satisfaction, within the time and weather constraints, and with zero safety incidents.

PROJECTS

NAVFAC Multiple LTM

Completion Date:

2023