by Paulo | Jun 8, 2015
Just prior to a real estate transaction of a private residence in Piscataway, RENOVA was contracted to investigate a discharge from a 550-gallon oil tank removal. The tank removal contractor was asking for a significant sum for a remediation, although they had no...
by Paulo | Jun 8, 2015
RENOVA self-performed on the installation of 162 timber piles to provide a deep foundation suitable for the construction of two (2) bioreactor tanks being used to capture leachate from the county landfill. Utilizing a 110-ton off-road truck crane and a 15,000-pound...
by Paulo | Jun 8, 2015
RENOVA self-performed on the installation of 390 helical piles to provide a deep foundation suitable for the installation of a ground-mount, 465 kw solar photovoltaic system. Utilizing a 25-ton excavator and 20,000-foot pound hydraulic drivehead, RENOVA installed the...
by Paulo | Jun 8, 2015
RENOVA self-performed on the construction of a 550-linear-foot sheet pile tieback wall, constructed to allow the prime contractor to safely and effectively excavate radiologically-contaminated soil, while preventing the costly and unnecessary soil disposal caused by...
by Paulo | Jun 8, 2015
RENOVA installed a combination of helical piles, a concrete grade beam, and a steel moment frame to provide an innovative, structurally sound, and complete foundation that would safely and cost-effectively comply with FEMA’s newly-released Base Flood Elevations and...